If Cp &Gt

1.0 but Cpk lt 1.0, then the following situation is occurring:

Group of answer

Question

If Cp 1.0 but Cpk 1.0, then the following situation is occurring:

Group of answer

choices

The process is out of control.

The process is capable of meeting design specifications.

The process mean is not centered between the upper and lower design specifications.

The process is in control.

Operations Management